Here is a look-ahead at the construction work planned for the Public Safety Building, from May 23, 2022 to May 27, 2022

Project Overview:

Construction of a combined public safety building commenced in December 2020 on the site of the former Town Hall at 26 Bryant Street. The new building will house the staff and equipment of Fire, Police, and Dispatch departments. The new combined Public Safety Building will replace two older Town buildings: Police Station at 600 High Street (built in 1962) and the Fire Station at 436 Washington Street (built in 1930). The new building is scheduled to open in the Fall of 2022.

livestream video of the construction is available on the Project website! Tune in from anywhere to watch the continued progress on the Combined Public Safety Building. While there, check out the updated Before-and-After photos of the progress onsite.

What to expect May 23, 2022 (Monday) through May 27, 2022 (Friday):

- The project site remains closed to the public.
- Contractors will be working onsite tomorrow, Saturday, May 21st, from 8:00 AM to 4:00 PM.
- The installation of the fire protection and sprinkler systems is substantially complete.
- The elevator was delivered on Thursday, May 19, 2022. Crews will begin installation this week.
- During this week, masons will take down the staging along the north side of the building, wash the stone exterior at the roof, and will remove materials off-site.
- Sheet metal installation for the rough duct work in the basement will continue this week.
- HVAC contractors will continue to install hot water mains in the basement, equipment in the Mechanic Room, piping condensers on the roof, and will insulate the duct work on the second floor of the Fire Station.
- Crews will continue to frame and glaze the curtain walls along the west and east sides of the building in advance of pressure plate and grid installation.
- Piping for the fire protection system (including sprinklers) will continue to be installed this week throughout the building.
- Expect periodic entrance and exit of large trucks at the project site entrance, located at the intersection of Washington Street and Bryant Street. Please expect minor traffic delays at this intersection.
- No additional traffic impacts or pedestrian impacts are anticipated during this week.

Public Viewing Area:

If you want to stop by to check out the progress, stand by the picnic table outside the north entrance to Town Hall. This spot provides a great view into the project site and is outside of the project boundaries. Worth a visit!

Construction Hours:

- Crews will be onsite:

- Saturday, May 21, 2022: 8:00 AM to 4:00 PM

- Monday through Friday: 7:00 AM to 5:00 PM

Project Team Contact Information:

- Immediate issues or concerns, please contact the Town Manager’s Office at 781-751-9100.

- For general questions or concerns, please contact the project team at psb@dedham-ma.gov

- For more information about the Public Safety Building Project, please visit the project website at www.dedham-ma.gov/psb

- Download our project team contact information flyer on the project website.

Click Here for more information